博客s
Air Charter Service received an urgent request from one of our key clients, on behalf of a company conducting exploration drilling in Tanzania. The request was to move two steam generator units 和 ancillary equipment from the UK to Mtwara, Tanzania.

Tanzania Oil 和 Gas Contract

Air Charter Service received an urgent request from one of our key clients, on behalf of a company conducting exploration drilling in Tanzania. The request was to move two steam generator units 和 ancillary equipment from the UK to Mtwara, Tanzania.

The equipment’s weight was 52 tonnes, with a load length in excess of 25 metres, at 2.9 metres high. The IL76MF was recommended – a ‘stretched’ version of the IL76, the only aircraft which could accommodate the load, without using the larger 和 more expensive AN-124.

The load was oversized, included hazardous material, was fragile 和 required immediate customs clearance on arrival, followed by in-country delivery. Owing to the time-critical nature of the charter, it was decided that the load would travel to the drilling base’s closest airfield capable of accepting an aircraft of this size – Dar es Salaam, the Tanzanian capital.

To keep aircraft positioning costs to a minimum, the load was moved by truck from the UK to the European mainl和, with a specialist Air Charter Service account manager present at aircraft-loading.

The load was successfully discharged at Dar es Salaam, departing for a two-day journey to the end client’s base in Mtwara. As a result of Air Charter Service’s quick response times 和 continued expertise in this sector, the cargo arrived in good order – with the total door-to-door transit, from the UK origin point to Mtwara, taking just five days.

For further information on 石油 & gas industry charters, simply contact a member of the team.

  • DEDICATED ACCOUNT MANAGERS
  • NO OBLIGATIONS
  • 30+ YEARS EXPERIENCE
  • AVAILABLE 24/7

EMAIL US

CALLBACK